Projects
Green's Windmill
Here we installed an oil powered generator and multiple power supplies throughout the mill for grinding grains.
4 x 125 Amp Ovens
Here we installed 4 x 125 Amp sintering ovens for a regular customer.
Complete Engineering Workshop
We installed this workshop from scratch. High bay lighting, sub mains, server cabs, power poles, machine power, machine data, QDS benches, CMM power, Quality control area, 12 x 3- phase macerators, Centralised vac system, speakers, emergency lighting, door access control system, gas shut off points and first aid beacons.
W/C Refurbishment
Here we installed LED lighting, Non contact taps, toilet flushers and hand dryers.
Site Induction Kiosk
Here we installed a site induction kiosk for a regular customer. This kiosk takes a photo of you, prints an identification sticker and gives you an on site induction.
Printing station
Here we installed power to this printer, 3 phase blower system and a 125 Amp U.V drying system.